Construction: December 2009 Archives

fireplace.jpgAndy and the crew tackled some interior work for the first week.  Framing out the walls in the basement, and tackling the light scoop interior. The only heat source currently in the house is the wood burning stove.





The pipes you see in the opening beside the foundation are our Geothermal temperature regulating system. It's sort of a homemade system that Walt recommended. The system consists of an intake and outflow pipes in the basement (second picture below). These openings feed a series of buried pvc pipes which condition the air by regulating it to the ground temperature, a very stable 50 - 60 degrees year-round. We'll post an update when we've had a chance to use it.


geothermal1.jpg

geothermal2.jpg

Episode 2
Straylight Short Film Series
TRT 6:44



Music: Mogwai "Ratts of the Capital" from the album Happy Songs for Happy People.
On Friday 4 December 2009, the Villa Straylight was delivered.  Not without a few hiccups (I'll elaborate later) but now a house exists.

Here's a raw time lapse video of the house being set, I'm choosing my favorite audio track, the rock mashup, I also made a Dub version and a Classical version for your enjoyment.




This time-lapse was shot on a Canon EOS Digital Rebel, using an intervalometer shooting one frame every 5 seconds. We started shooting at 8:30a - 4:45pm. The original material is 1936 x 1288. This was crunched to 726 x 483, using h264 codec out of FCP.

The house was on three trailers. 1 @ 14' x 36', 1 @ 12' x 36' and one with the light scoop and parapet walls to be finished on site. You can see the crane stack the trailers as each one is finshed.

----------

Also, here's a 150 still images, unedited, as a flickr slideshow.


The two halves of the house were delivered today, to be set on the foundation tomorrow.