Week 7

It's been an incredibly busy January, so it's been two weeks since we last visited the site.  In the mean time;
The septic has finally been finished. 
The radiant heat is still radiating gloriously.
The cork floor has been delivered (not installed).
The ikea kitchen has been delivered (not installed).
The first floor bathroom was just leveled and the floor tiled.
The basement has been sheet rocked.
The back-up heat system (a long story) has been installed and ventilation run around the basement perimeter (see photos below).

And at long last, the siding has been completed.  It looks great.  The vertical tongue-in-groove rough cedar planks were all stained in the basement and dried before going up on the house.






Plus our radiant heat system looks like the engine of a sports car!