Fall 2009 Update!

It has been an unnecessarily long and drawn out year of trying to get this house built.  We've waded through countless bids and considered every route from stick built to various levels of prefabrication.  The gory details can wait until it is finished, but at long last it is moving forward - with a functional plan and people in place to get the job done. 

The final recipe is:


1. Architectural Design by Rapson Architects based on the Case Study House # 4
2. Factory and Prefab coordination and consulting by Walter Bestwick.
3. Prefab Foundation by Superior Walls.
4. Prefab house construction built in the Penn Lyon factory in Selinsgrove, PA
5. Site prep and on-site finishing by Hidden Valley Construction. (who have been fantastic!)